000 01030nam a22002297a 4500
008 151117b xxu||||| |||| 00| 0 eng d
020 _a9780727703613 (pbk.)
020 _a0727703617 (pbk.)
082 _a624.8
_bFIP/C
110 _aFIP Commission on Prefabrication.
_bWorking Group on Concrete Railway Sleepers.
245 _aConcrete railway sleepers /
_cby FIP Commission on Prefabrication, Working Group on Concrete Railway Sleepers.
260 _aLondon :
_bThomas Telford,
_cc1987.
300 _a22 p. :
_bill. ;
_c30 cm.
440 _aFIP state of art report.
500 _aIncludes bibliographical references.
500 _aConcrete railway sleepers.-(FIP state of art report)
505 _aIntroduction Design considerations Rail fastening systems Manufacturing Quality control and testing Installation and field performance Research and development Conclusions
650 _aConcrete railroad ties.
650 _aGround transportation systems and equipment.
650 _aComposite materials.
942 _2ddc
_cTB
999 _c750
_d750